ST MARTINS CHURCH BOWNESS ON WINDERMERE
ARCHITECTS PRACTICE – JOHN COWARD
CLIENT – PAROCHIAL CHURCH COUNCIL
FUNDED BY – N/A
CONTRACT SUM – £243’544.97
CONTRACT PERIOD – 24 WKS
WORKS COMPLETED IN – 26 WKS
WORKS CONSIST ON THE GRADE 1 LISTED BUILDING TO ADDRESS A LARGE NUMBER OF HIGH-LEVEL MASONRY REPAIRS TO THE TOWER, ALONG WITH MASONRY REPAIRS TO THE NORTH AND SOUTH CLEAR STOREY WINDOWS. REPOINTING OF MASONRY IN HOT LIME.
THE STRIPPING OF THE EXISTING LEAD FROM THE SOUTH AISLE ROOF, TIMBER REPAIRS TO THE STRUCTUAL TIMBERS THEN FORMING NEW CODE 8 LEAD ROOF COVERING.