ST BARTHOLOMEWS CHURCH
MORETON CORBET
ARCHITECTS PRACTICE – ARROL & SNELL LTD
CLIENT – PAROCHIAL CHURCH COUNCIL
FUNDED BY – HERTIGAGE LOTTERY FUND
CONTRACT SUM – £173’239.20
CONTRACT PERIOD – 24 WEEKS
WORKS COMPLETED IN – 26 WEEKS
WORKS CONSISTED ON THE GRADE 1 LISTED BUILDING TO ADDRESS A LARGE NUMBER OF HIGH-LEVEL REPAIRS, REPLACEMENT OF THE EXISTING TOWER ROOF, THE SOUTH PITCH OF THE SOUTH AISLE AND BOTH PITCHES TO THE CORBET FAMILY PEW, ALSO TO ACCOMMODATE A NEW WC WITHIN AN EXISTING SIDE STORE BUILDING.
THE EXISTING STORE BUILDING REQUIRED PARTIAL DEMOLITION AS STRUCTURALLY UNSTABLE, THE STORE HAD TO BE REBUILT AS EXISTING WITH A NEW ROOF AND DRY LINING SYSTEM INCORPORATED, LANDSCAPING WORKS TO BE UNDERTAKEN TO CREATE AN EVEN SURFACE FROM THE EXISTING PATH TO THE NEW WC, NEW BELOW GROUND DRAINAGE WAS REQUIRED INCLUDING NEW MAINS WATER CONNECTION AND TRENCH ARCH DRAINAGE SYSTEM FOR FOUL WATER.