LIVERPOOL ANGLICAN CATHEDRAL WELL FLOOR

PROJECT TITLE – LIVERPOOL ANGLICAN CATHEDRAL WELL FLOOR
ARCHITECT – MIKE DARWELL OF JOHN COWARD
CLIENT – DEAN AND CHAPTER OF LIVERPOOL CATHEDRAL
CONTRACT SUM – £151’358.83
CONTRACT PERIOD – 15 WEEKS
WORKS COMMENCED – 6th JANUARY 2020

WORKS CONSISTED OF DIAMOND CUTTING THROUGH THE JOINTS IN THE LIMESTONE FLOOR TILES AND THROUGH THE CONCRETE SCREED TO A DEPTH OF 160MM, CAREFULLY LIFTING THE EXISTING LIMESTONE FLOOR TILES. REMOVAL OF CONCRETE SCREED AND EXISTING UNDERFLOOR HEATING PIPES. 

INSTALATION OF NEW UNDERFLOOR HEATING MATRIX AND SCREED, THEN RELAYING THE EXISTING LIMESTONE TILES ALONG WITH NEW HOPTONWOOD TILES TO REPLACE DAMAGED TILES.