ADLINGTON HALL MEWS

CLIENT – CAMILLA LEGH
FUNDED BY – N/A
CONTRACT SUM – £44’255.59
CONTRACT PERIOD – 12 WEEKS

WORKS CONSIST ON THE GRADE II* LISTED BUILDIING TO CARRY OUT STRUCTURAL STEEL REPAIRS TO BALCONIES ON THE MEWS, THIS INVOLVES THE REMOVAL OF THE EXISTING TIMBER DECK WHICH ALLOWED THE EXISTING IRON WORK TO BE NEEDLE GUNNED TO REMOVE RUST BACK TO BARE METAL.

PRIMING OF EXISTING IRON WORK, REPLACEMENT OF STRUCTURAL STEEL, REPAINTING WITH A 5 COAT EPOXY PAINT SYSTEM

Gallery Images